The area of exterior wall upgrading is about 12,000 sqm, the waterproof repair area is about 12,000 sqm, and the concrete pavement asphalt laying and pavement well repair area is about 21,000 sqm. During the construction process, BMP actively searched for each tenant, investigated the operation plan and construction impact, reasonably formulated the construction process and protection plan, and minimized the impact on the operation of the park. overcoming many difficulties such as the covid, and the "two sessions" , the project successfully acceptance and handover was carried out smoothly with the owner on June 9, 2023.